ENCN

Search
Confirm
Cancel

Module Offloading Facility Transition Pontoon

Number of views:
1005

Quantity:1 pcs

Name:MOFTP 14040

Classification:Lloyd’s Register

Year:2014

Yard:Damen/Yahua Shipyard, Nantong, China.

Owner: ALE Heavy lift

Quantity:
Name:
Year:
Classification:
Yard:
Owner:
Quantity:
Name:
Year:
Classification:
Yard:
Owner:
Retail price
0.0
Market price
0.0
Number of views:
1005
Product serial number
Category
Project
Quantity
-
+
Stock:
1
Project description
Parameters
Description:
The MOFTP is 140m long, 40m wide and 12m deep and has a dead weight tonnage of just under 20,000 tonne. Van der Leun China delivered a full scale electrical engineering system integration project on this loading facility which included the installation of frequency drive panels, switchboards, an automatic ballasting system as well as all lighting, switches and sockets. 
Scope of supply:
Electrical system integration
Project management 
Electrical engineering & cable routing
Delivery of main switchboard 690V
Delivery of all distribution panels 440V/ 230V/ 24Vdc
Delivery of all starter panels 440V/ 230V/ 24Vdc
Delivery of frequency drive panels
Delivery of power management system
Delivery of alarm and monitoring system
Delivery of automatic ballasting system
Delivery of transformers
Delivery of all lighting, sockets and switches
Delivery of cables and MCT’s
On-site building supervision
Commissioning & sea trails

 

Scan the QR code to read on your phone
We could not find any corresponding parameters, please add them to the properties table
Please scan the QR code to follow us. X
guomei111.jpg

About us   |    Services    |    Products    |    Projects    |    News    |     Contact us

Copyright ©2020 Van der Leun (Suzhou) Electrical Engineering Co., Ltd    Privacy Policy     苏ICP备19065031号-1

Copyright ©2020 Van der Leun (Suzhou) Electrical Engineering Co., Ltd

苏ICP备19065031号