ENCN

Search
Confirm
Cancel

Project News - IHC 550T Reel Lay System

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2021-08-31
  • Views:0

(Summary description)The 550T Reel Lay System is being installed onto the Shenda ship in Qingdao after almost an 8-month delay because of the COVID-19 pandemic.

Project News - IHC 550T Reel Lay System

(Summary description)The 550T Reel Lay System is being installed onto the Shenda ship in Qingdao after almost an 8-month delay because of the COVID-19 pandemic.

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2021-08-31
  • Views:0
Information

The 550T Reel Lay System is being installed onto the Shenda ship in Qingdao after almost an 8-month delay because of the COVID-19 pandemic outbreak during the New Year holidays. Jack (featured below) has been there since October and is in charge of the whole electrical engineering system of the project. 


Special thanks to Steven for the safety guidance.

Keyword:

Scan the QR code to read on your phone

Follow us on

Please scan the QR code to follow us. X
guomei111.jpg

About us   |    Services    |    Products    |    Projects    |    News    |     Contact us

Copyright ©2020 Van der Leun (Suzhou) Electrical Engineering Co., Ltd    Privacy Policy     苏ICP备19065031号-1

Copyright ©2020 Van der Leun (Suzhou) Electrical Engineering Co., Ltd

苏ICP备19065031号