Main electrical cabinets for a Haixin 26800CBM dredger have passed CCS FAT successfully
- Categories:Company News
- Author:
- Origin:
- Time of issue:2023-04-23
- Views:0
(Summary description)Royal Van der Leun (China) supplies a low-voltage electrical package to Haixin Shipyard for its 26800CBM Trailing Suction Dredger which is named Xinzilang 6.
Main electrical cabinets for a Haixin 26800CBM dredger have passed CCS FAT successfully
(Summary description)Royal Van der Leun (China) supplies a low-voltage electrical package to Haixin Shipyard for its 26800CBM Trailing Suction Dredger which is named Xinzilang 6.
- Categories:Company News
- Author:
- Origin:
- Time of issue:2023-04-23
- Views:0
Royal Van der Leun (China) supplies a low-voltage electrical package to Haixin Shipyard for its 26800CBM Trailing Suction Dredger which is named Xinzilang 6. The package mainly includes Main switchboards of 450V and 230V, Emergency switchboards of 450V and 230V, Fore switchboard, Shore supply connection boxes and Group starter panels, Charging and discharging panels, Electrician test panels as well as other electrical boxes of different systems.
Image 1: the Fore switchboard in the workshop
These switchboards and cabinets have been produced from January to April, 2023 according to agreed production plan. They all passed the Factory Acceptance Test (FAT) successfully under the survey of CCS surveyors and were delivered to the yard with satisfactions from the customer.
Image 2: 450V and 230V MSB in the workshop
Image 3: Group starter panels & power cabinets
The owner of Xinzilang 6 is Haihong, the mother company of Haixin Shipyard. Royal Van der Leun was told that it will be rented to Europe and undertake dredging projects there. We are looking forward to seeing its first dredging job.
Image 4: Xinzilang 1 (for reference)
Scan the QR code to read on your phone
Copyright ©2020 Van der Leun (Suzhou) Electrical Engineering Co., Ltd Privacy Policy 苏ICP备19065031号-1
Copyright ©2020 Van der Leun (Suzhou) Electrical Engineering Co., Ltd